PO Box 32096

Louisville, KY 40232

Office: 724-766-1046

© 2019 by Advantage Blasting & Demolition, LLC

 

Our Mission is to

ANTICIPATE & EXCEED

Your Expectations

The Lilly family was in attendance at the time of the detonation of their name-sake bridge (home of their historical family reunions).

Return to:

Project Experience

Lilly Bridge

The Lilly Bridge, located over Bluestone Lake in Summers County, WV, was detonated on November 16, 2015 for the WV Division of Highways, District 9. The bridge was a five span thru-truss structure with 4 – 80’ tall concrete piers.

 

The five spans over the Lake where demolished through the utilization of Controlled Explosives. The demolished spans where accessed by an installed temporary rock causeway. The spans where systematically processed and shipped for recycling.

 

The four concrete piers where drilled and imploded as well. The demolition of these piers by explosives was due to the existing height and safety concerns that would be generated if performed conventionally.

Our Blast Today Is Your Advantage Tomorrow

The quick and easy way to endless possibilities.

Advantage Blasting and Demolition is licensed and authorized to perform both explosive demolition and conventional demolition projects nationwide.

Although we offer two separate divisions of demolition, by combining our resources, we're able to perform any turnkey demolition project needed.

Our goal at Advantage Blasting & Demolition is to formulate, develop & streamline (with one-on-one communication) the best options available via conventional and/or explosive demolition, a process to complete every job to our customer’s satisfaction in a safe, timely & cost efficient manner.

Conventional Demolition provides a cost effective option for both the client and the environment. The majority of materials created can be recycled for future construction projects, saving landfills from being overwhelmed and allowing our environment to prosper.